JUNDUO Jewelry
Buyer Guide
OEM Brass Jewelry Sourcing7 min read

OEM Jewelry Manufacturer China Project Guide

Working with an OEM jewelry manufacturer in China is most efficient when the buyer gives clear product references, target quantity, material, plating, packaging and market requirements before sample making starts.

OEM jewelry sample development for brass fashion jewelry

OEM input

Photos, samples, sketches or design files

Sample lead time

7-15 days after details are confirmed

Bulk lead time

15-30 days depending on order requirements

Production model

OEM, ODM and wholesale brass jewelry

Fashion jewelry brands developing private label collections

Amazon and Shopify sellers building custom brass jewelry SKUs

Designers turning sketches and references into factory samples

Wholesalers planning OEM projects with repeat order potential

Build the brief before asking for price

A vague request usually produces a vague quotation. For OEM jewelry, buyers should define the product category, wearing structure, size, plating color, stone, packaging and target order quantity.

If the project is still early, share the target market and retail positioning so the factory can suggest a realistic production route.

  • Product reference or sketch
  • Target material and plating
  • Stone, pearl, enamel or decorative parts
  • Quantity, packaging and delivery window

Use sampling to reduce production risk

Samples help confirm size, color, wearing structure and surface finish before mass production. For new brass jewelry designs, sampling is also the moment to adjust weight, chain length, stone size and assembly details.

The approved sample should be kept as the bulk production standard.

Move from sample approval to bulk production

After sample approval, the buyer and factory should lock final specifications, order quantity, packaging, compliance needs and delivery timing. Changes after this point may affect cost and production schedule.

JUNDUO supports project communication from concept review to sample making, bulk production, inspection and packing.

Buyer checklist

  • Send product references before requesting exact pricing.
  • Confirm material, plating, stone and size early.
  • Ask whether molds or custom components are needed.
  • Approve samples before starting bulk production.
  • Keep final packaging and compliance requirements in writing.

Related sourcing pages

FAQ

Can JUNDUO make OEM jewelry from photos?

Yes. JUNDUO can review photos, samples, sketches or design files and suggest practical production details.

How long does an OEM jewelry sample take?

Typical sample lead time is 7-15 days after design and production details are confirmed.

What information helps an OEM factory quote faster?

Product references, material, plating, size, quantity, packaging, target market and compliance requirements help the factory quote faster.

WhatsAppSend Inquiry